1. Pre-Operation Inspection
Seal Integrity Check
Visually inspect the seal structure (such as packing seals, mechanical seals, or labyrinth seals) for cracks, wear, or deformation. For packing seals, check if the packing is loose, hardened, or discolored (which may indicate oil leakage or material infiltration).
Ensure auxiliary components (e.g., sealing rings, gaskets, and retaining rings) are properly installed without misalignment or missing parts.
Lubrication and Cooling System Check
For seals with lubrication requirements (e.g., mechanical seals), confirm that the lubricating oil/grease is filled to the specified level, clean, and free of impurities. Check the oil circuit for blockages or leaks.
If equipped with a cooling water system (common in high-temperature working conditions), verify that the water flow is smooth, the pressure is stable, and there is no scaling in the pipeline (scaling can reduce cooling efficiency and damage the seal).
Shaft Runout Detection
Use a dial indicator to measure the radial and axial runout of the mixer shaft at the seal position. Excessive runout (usually exceeding 0.1mm) will cause uneven force on the seal, accelerating wear. If runout is abnormal, adjust or repair the shaft and bearing first.
2. Operational Precautions
Start-Up and Shutdown Procedures
Start-up: Before feeding, run the mixer idly for 2–3 minutes to ensure the seal is fully lubricated and the shaft rotates smoothly. Avoid sudden start-up under full load, as impact force may damage the seal.
Shutdown: After stopping the mixer, clean residual materials near the shaft end in time (especially viscous or abrasive materials like concrete, mortar, or sludge) to prevent material caking from squeezing or abrading the seal during the next start-up.
Monitoring During Operation
Leakage Observation: Regularly check for material leakage (solid particles or slurry) or lubricant leakage (oil stains) at the shaft end. A small amount of initial seepage (e.g., 1–2 drops/hour for mechanical seals) is normal, but continuous leakage or a sudden increase indicates a problem.
Temperature and Vibration Monitoring: Use an infrared thermometer to measure the seal surface temperature. Abnormal heating (exceeding 40–50°C above ambient temperature) may indicate insufficient lubrication or friction caused by misalignment. Abnormal vibration or noise near the seal may signal loose components or seal wear.
Avoid Overloading: Strictly control the mixing load (material viscosity, particle size, and filling rate) within the equipment's design range. Overloading increases shaft torque and seal friction, leading to premature failure.
Handling Special Materials
For abrasive materials (e.g., sand, gravel) or corrosive materials (e.g., acidic/alkaline slurries), shorten the inspection interval. Consider increasing lubrication frequency or using wear-resistant seal materials (e.g., polyurethane, ceramic coatings) in advance.
For high-temperature materials (above 80°C), ensure the cooling system works continuously and monitor for seal aging (e.g., hardening of rubber seals due to high temperature).

3. Routine Maintenance
Regular Cleaning
Use a soft brush, compressed air, or low-pressure water to clean the shaft end and seal surface. Avoid using high-pressure water directly on the seal (it may wash away lubricant or damage the seal structure).
For sticky materials (e.g., clay), use a solvent (compatible with the seal material) to dissolve residues, but avoid corrosive cleaners that may erode rubber or plastic components.
Lubrication and Replacement
Lubrication: Follow the equipment manual to add lubricant at fixed intervals. For packing seals, inject grease evenly into the grease nipple to form a lubricating film between the packing and the shaft. For mechanical seals, replace the lubricating oil regularly (usually every 1,000–2,000 operating hours) to prevent oil degradation.
Seal Replacement:
Packing seals: Replace the packing when it is hardened, cracked, or cannot stop leakage after tightening. When installing new packing, cut it into rings with 45° diagonal cuts, stagger the joints (by 90–120°), and tighten the gland evenly (avoid over-tightening, which may cause excessive friction and heating).
Mechanical seals: Replace the entire seal assembly if the dynamic/static ring is worn, the spring is deformed, or the O-ring is aged. Ensure the new seal's specifications (size, pressure resistance, temperature resistance) match the original model.
Auxiliary System Maintenance
Clean the lubrication system's filters monthly to prevent impurities from entering the seal. Replace the filter element regularly according to the manual.
For cooling water systems, descale the pipeline every 3–6 months (using descaling agents or acid cleaning) to maintain heat exchange efficiency. Drain water completely when the equipment is shut down for a long time to prevent freezing or rusting.